Danessa Rivera (The Philippine Star) – January 15, 2021 – 12:00am MANILA, Philippines — Lopez-led Energy Development Corp. (EDC) has kicked off the construction of the P1.3-billion expansion of the Bacon-Manito (BacMan) geothermal power plant. EDC has awarded the engineering, procurement and construction (EPC) contract for the 23-megawatt (MW) Palayan Binary Balance of Plant (BOP) work package to construction firm First Balfour Inc., also a Lopez firm. The contract covers the installation of equ